Client | Scope Of Work | Consultant Engineer In Charge | Date Of Completion | Contract Value ( RM ) |
---|---|---|---|---|
Engineer In Charge | ( RM ) | |||
Century Engineering PTY.LTD. | To supply,Fabricate,Delivery of launders for four(4) units Western WWTP Clarifiers for Century Engineering PTY LTD. | 30-11-2017 | ||
Sodimex FR S.A | Proposed Upgrading Kernel Plant to 40mt FFB per hour Processing at Edea,Cameroon. | 05-11-2017 | ||
BLUEMAC RESOURCES | Proposed Construction of Palm Oil Mill 10/20mt FFB per hr processing at Phnom Penh,Cambodia. | 01-02-2018 | ||
SODIMEX S.A | Supply Mild Steel 2000MT Oil Tank Farm for Sierra Leone. | 20-01-2015 | ||
BOUSTEAD ESTATES AGENCY SDN BHD | Supply 3 units of S.S 304 type Tilting Steriliser System c/w Steriliser Hydraulic,Hydraulic Tubing,Power Pack,Frontal Piping,Insullation and Hydraulic & Steam Automation Control System at Bintulu,Sarawak. | 10-07-2015 | ||
MEJER FLORESTAL | Supply Labour to site ,Installation Works for Tiliting Steriliser c/w Hydraulic & Steam Control System and Conveyors and Electrical Works at Belem,Brazil. | 02-01-2015 | ||
MEJER AGROFLORESTAL | Supply Procurement,Contruction and Commissioning of Turnkey Project for S.S 304 type Tilting Steriliser c/w Hydraulic System (2 sets) at Belem,Brazil. | 14-10-2014 | ||
SODIMEX S.A | Supply,Deliver (Soc Container - FOB),Installation for New Garage c/w Roof Sheets with 25% Transparent Sheets for Junior Mill,Congo. | 31-07-2014 | ||
CHOKE WANLLAPA PALM OIL CO.LTD. | Supply 1 unit S.S 304 Tilting Streriliser c/w Additional Automatic System Ex- Bukit Kayu Hitam. | 27-06-2014 | ||
PT INA BESTEEL | Supply Mechanical Works for PT Gruti Lestari Pratama,Indonesia. | 15-05-2014 | ||
SODIMEX S.A | Supply,Deliver (FOB Port Klang),Install.Test and Commissioning of Raw Water and Boiler Water Treatment Line at Sierra Leone. | 25-03-2014 | ||
SODIMEX S.A | To Supply,Fabricate and Deliver (FOB). | 10-07-2013 | ||
SODIMEX S.A | Supply New Garage. | 22-01-2014 | ||
SODIMEX S.A | Supply 1 unit Digester,Screw Press & 2 units Extension Conveyor w/o Gear Motor for Sierra Leone. | 26-03-2014 | ||
UNITED OIL PALM INDUSTRIES SDN BHD | Supply 3 units TS. | 08-07-2013 | ||
SINAR FIRUS SDN BHD / SAWIT KEJURUTERAAN SDN BHD | To supply 6 units TS. | 03-07-2013 | ||
SODIMEX S.A | Supply Spare Parts. | 25-09-2013 | ||
KLUANG PALM OIL PROCESSING SDN BHD | Supply 4 units TS. | 25-12-2013 | ||
THONGMONGKOL PALM OIL IND.CO.LTD. | Supply 3 units TS | 18-06-2013 | ||
SODIMEX S.A | Supply Terrain Crane (FOB) | 02-05-2013 | ||
VV PALM OIL MILL | Supply 2 units TS | 25-05-2013 | ||
SODIMEX S.A | Okomu Mill (FOB) | 15-12-2013 | ||
SODIMEX S.A | Supply SOGB POM Extension | 02-07-2013 | ||
PERTUBUHAN PELADANG NEGERI PERAK | Supply, manufacture, fabricate, deliver, installation, test, construct, complete and commission tilting steriliser system 30MT per hour (Civil,Mechanical & Electrical Works) untuk Kilang Kelapa Sawit PPN Perak di Ladang Kampung | 03-08-2013 | ||
PERAK AGRO MILL SDN BHD | Supply materials, labour, fabrication, consumables, delivery, installation, tools and equipments with 2 painting system. | 30-09-2013 | ||
DELTA PELITA SEBAKONG SDN BHD | 4 Units SUS304 Tilting Sterilizer of 3200x7200 sl c/w Hydraulic & Steam Control System | - | 29-02-2012 | |
TOPAZ EMAS SDN BHD | 4 Units of MS Tilting Sterilizer Hydraulic & Steam Control System. | - | 31-03-2012 | |
KEMAYAN PALM OIL MILL | Mild Steel Tilting Sterilizer. | - | 31-05-2012 | |
SODIMEX S.A | Kemel Recovery Plant of Capacity 30MT Ext 60MT FFB Per Hour POM Processing at Sierra Leone,Africa. | - | 31-07-2012 | |
SODIMEX S.A | Engineering,Procument,Constuction and Commisioning of Junior Mill of 18MT FFB Per Hour Processing at Dempcratic Republic Of Congo,Africa. | - | 30-04-2012 | |
SODIMEX S.A | Supply,Fabricate and Deliver (FOB Klang)1 Unit of 2000T CPO Tank and 1 Unit of 600m Water Tank for Sierra Lione,Africa. | - | 31-01-2012 | |
PT BUANA SAWIT INDAH | 2 Units SS304 Tiltiong Sterilizer Palm Oil Mill 45MT FFB Per Hour Processing At Samudera ,Indonesia. | - | 30-04-2012 | |
PT INA BESTEEL | TS c/w hydraulic & steam control system. | - | 31-03-2012 | |
SODIMEX S.A | 20000kg Vickers BI-Drum Water Tube Boiler & Local Potion | - | 30-06-2012 | |
ENG HONG PALM OIL MILL SDN BHD | 4 Units Tilting Sterilizer | - | 30-04-2013 | |
SINAR FIRUS SDN BHD / SAWIT KEJURUTERAAN SDN BHD | 6 Units Tilting Sterilizer | - | 31-05-2013 | |
KLUANG OIL PALM PROCESSING SDN BHD | 4 Units tilting Sterilizer | - | 30-04-2013 | |
KILANG KELAPA SAWIT BUKIT PASIR | 4 Units Tilting Sterilizer. | - | 30-04-2013 | |
VV PALM OIL MILL | Tilting Sterilizer. | - | 31-05-2013 | |
OKOMU PALM OIL MILL,NIGERIA. | Engineering, Procurementm, Construction and Commissioning of new line under Tilting Sterilizer System POM capacity 30mt ext 60mt , Okomu Nigeria. | 16-05-2014 | ||
PT BUANA SAWIT INDAH | 2 UNITS SS304 TILTING STERILIZER PALM OIL MILL 45MT FFBPER HOUR PROCESSING AT SAMUDERA,INDONESIA. | BESTEEL BERHAD | 02-09-2013 | |
PERAK AGRO MANAGEMENT SERVICES | EXTENTION OF MILL TO 60TPH (CIVIL,MECHANICAL&ELECTRICAL WORKS) FOR KELAPA SAWIT KG GAJAH, PERAK. | BESTEEL BERHAD | 30-09-2013 | |
BOUSTEAD ESTATES AGENCY | UPGRADING OF COMPLETE STERILIZER SYSTEM C/W CIVIL/BUILDING,ELECTRICAL AND PIPING WORKS FOR SEGARIA PALM OIL MILL, SEMPORNA, SABAH. | BESTEEL BERHAD | 27-04-2013 | |
JUNIOR PALM OIL MILL,CONGO. | ENGINEERING, PROCUMENT, CONSTRUCTION AND COMMISIONING OF JUNIOR MILL OF 18MT FFB PER HOUR PROCESSING AT DEMOCRATIC REPUPLIC OF CONGO,AFRICA. | BESTEEL BERHAD | 01-10-2013 | |
SAWIT KINABALU GROUP | THE EXECUTE & COMPLETION OF CONTRACT FOR CIVIL & STRUCTURAL, MECHANICAL & PIPING WORKS AND ELECTRICAL FOR THE PROPOSED REFURBISHMENT WORKS FOR SANDAU PALM OIL MILL AT SANDAU ESTATE, LAHAD DATU, SABAH. | BESTEEL BERHAD | 01-03-2012 | |
PT BINTANG HARAPAN DESA | UPGRADING KALIMANTAN PALM OIL MILL | BESTEEL BERHAD | 02-04-2012 | |
Mbambou Palm Oil Mill | EPCC of 30MT Ext 60MT FFB/HR Palm Oil Mill | Besteel Berhad | 00-00-0000 | |
Sodimex S.A | Thresher and Fruit Elevator. | Besteel Berhad | 26-10-2010 | |
Harcos Construction | 1 Set Empty Bunch Crusher. | Besteel Berhad | 06-08-2010 | |
Boustead Estates | Replacement of Bunch Hopper & Conveyor Over Hopper for Lepan Kabu Palm Oil Mill, Pahi, Kelantan. | Boustead Estates | 23-07-2010 | |
Boustead Estates | Overhead Water Storage Tank at Sg.Jernih Palm Oil Mill Pekan,Pahang. | Boustead Estates | 28-07-2010 | |
Boustead Estates | Replacement of Empty Bunch Conveyor for Segaria Palm Oil Mill,Sabah | Boustead Estates | 10-08-2010 | |
Apeco Engineering(M) S/B | 13 Units Tank, 7 Units Vessel and 7 Units Seal Potfor A Bio-Ethanol Plant in Kuala Selangor. | Besteel Berhad | 00-00-0000 | |
Sodimex S.A | Supply In Fabricate 1 Unit Fruit Elevator in Thresher Station FOB Port Klang. | Besteel Berhad | 00-00-0000 | |
Harcos Engineering(M)S/B | To supply, fabricate and deliver stainless steel pontoon of raw water pump for Tee Teh, Keratong, Pahang. | Harcos Engineering(M)S/B | 12-02-2010 | |
PT. Ratu Sejagad | Design, Construct, Supply, Test & Commission 60 mt FFB/HR Extendable to 90 mt FFB/HR, | Besteel Berhad | 00-00-0000 | |
PT. Kharisma Rumahgunung | Proposed Turnkey Contract for constructing a 15/30ton per hour palm oil mill at Desa Sungai Merah, Kabupaten Sarolangun for PT Kharisma RumahGunung | Besteel Berhad | 00-00-0000 | |
PT. Emjiprimko | Design and build 60 mt FFB/HR Crude Palm Oil Mill and Compost Plant at Kabupaten Kampar, Rokan Hulu, Riau Indonesia | Hap Soon Enineering | 00-00-0000 | |
PT. Pinago Utama | Engineering, Procurement, Construction and Commissioning (EPCC) of Upgrading 90 MT FFB/Hr to 110 MT FFB/Hr Palm Oil Mill for PT. Pinago Utama at Babat Toman Sekayu Palembang, Indonesia. | Besteel Berhad | 05-11-2008 | |
PT. Pinang Witmas Sejati | Supply, Manufacture, Fabricate, Deliver, Install, Test and Complete Equipment for Capacity Expension from 45 MT/HR to 90 MT/HR FFB Processing for Palm Oil Mill, PT. Pinang Witmas Sejati, Palembang, Indonesia. | Agropac Consultants Sdn Bhd | 08-12-2008 | |
PT. Pinang Witmas Sejati | Supply, Delivery, Fabricate and Installation of 1 unit Cage Tipper, Inclined Fruit Conveyor and 1 Unit Thresher at Retus Palm Oil Mill, Sibu, Sarawak. | Tradewinds Plantation Mgmt | 08-12-2008 | |
Tradewinds Plantation Services Sdn. Bhd. | Supply, Delivery, Fabricate and Installation of 1 unit Cage Tipper, Inclined Fruit Conveyor and 1 Unit Thresher at Retus Palm Oil Mill, Sibu, Sarawak. | Tradewinds Plantation Mgmt | 18-08-2009 | |
Boustead Estates Agency Sdn. Bhd. | The Supply, Delivery, Installation and Commissioning Replacement of Thresher Drum, Transfer Carriage, Destoning Expansion Box and Additional New Kernel Silo for Segamaha Palm Oil Mill, Lahad Datu, Sabah. | Boustead Estate Agency S/B | 01-12-2008 | |
PT. Gunung Tua Abadi | Construction, Completion and Guarantee of Mechanical and Water Treatment Plants for The Proposed PKS Sumber Sawit. | PT. Gunung Tua Abadi | 01-03-2009 | |
PT. Rebinmas Jaya c/o : Delloyd Plantation Sdn. Bhd. | Construction, Completion, Commission and Guarantee of Mechanical Works for PT. Rebinmas Jaya Palm Oil Mill. | Perunding HMT Sdn. Bhd. | 01-07-2009 | |
Sabah Softwood Bhd. | Eecution and Completion of Contract No. 4 Civil & Structural Works For The Proposed 45/90 TPH Palm Oil Mill at Ladang Kapilit, Kalabakan, Sabah for Sabah Softwood Bhd. | Konsultant Proses Sdn Bhd | 17-08-2009 | |
Asiatic Development Berhad | Construction of Complete Unit Incinerator No. 1 ~ Asiatic Sabapalm Oil Mill, Sandakan Sabah. | Asiatic Dev. | 11-07-2008 | |
Sarawak Plantation Agriculture Dev. S/B | Proposed Upgrading of Niah Palm Oil mill from 60 TPH to 120 TPH at Ladang Tiga, KM76, Miri-Bintulu Road,Miri Sarawak. ~ Civil & Structural Works ~ Mechanical and Piping Works | Konsultant Proses Sdn Bhd | 15-03-2008 | |
PT. Pinang Witmas Sejati | Supply, Manufacture, Fabricate, Delivery, Install, Test and Complete 2nd Line Equipment For Palm Oil Mill PT Pinang Witmas Sejati, Palembang, Indonesia | Besteel Berhad | 30-09-2006 | |
PT Boustead Indonesian Management Consultancy Services | Supply, Fabricate & Delivery to Site Mechanical Works & Proprietary & Specialist Items (Import Portion) & Supply, Fabricate, Install & Commissioning of Building & Structural, Mechanical (Local Portion) and Electrical Works fo | Boustead Estate Agency S/B | 05-10-2006 | |
Syarikat Penanaman Bukit Senorang Sdn Bhd | Supply, Fabricate, Installation & Upgrading Of Boiler Station Machinery | Boustead Consultant | 00-00-0000 | |
PT. Pinang Witmas Sejati | Supply of One (1) unit 1,200kw Shinko RB4 Steam Turbine | Besteel Berhad | 00-00-0000 | |
PT. Karimun Aromatics Co., Ltd | The Execution And Completion Of Refurbishing Works For Bukit Mas Palm Oil Mill | Konsultant Proses Sdn Bhd | 00-00-0000 | |
PT Sriwijaya Oil In'sia Palembang | 30mt FFB/Hr POM at Palembang Sumatera Selatan, Indonesia Turnkey Project | Besteel Berhad | 09-09-2006 | |
Thaindo Palm Oil Factory Co. Ltd | Engineering, Procurement, Construction and Commissioning of 30-45mt FFB/Hr POM, Thailand , Lumthap, Krabi | Besteel Berhad | 30-04-2005 | |
Penuwasa Sdn. Bhd. | Mechanical & Civil Works at Sabah Serudung Palm Oil Mill | Perunding AME | 07-12-2006 | |
Boustead Estates Agency Sdn. Bhd. | Supply and Delivery - Sabah POM - 9 units 10500kg fruit cages to Segamaha POM, Lahad Datu | Besteel Berhad | 22-08-2006 | |
Penuwasa Sdn. Bhd. | Supply, Fabricate, Paint & Delivery to Langkon POM of 1 unit Bare Shaft Threshar Drum | Besteel Berhad | 15-05-2006 | |
Melangking Oil Palm Plantation S/B | Supply, Fabricate & Delivery mill at Sukau, Sandakan, Sabah ~15 units of 10 FFB Cages | Konsultant Proses Sdn Bhd | 15-03-2005 | |
Syarikat Penanaman Bukit Senorang Sdn Bhd | Supply, Fabricate, Installation & Upgrading of Boiler Station Machinery | Boustead Consultant | 05-09-2005 | |
PT. Pinang Witmas Sejati | Supply of One (1) unit 1,200kw Shinko RB4 Steam Turbine | Besteel Berhad | 30-04-2005 | |
PT. Karimun Aromatics Co., Ltd | The Execution And Completion Of Refurbishing Works For Bukit Mas Palm Oil Mill | Konsultant Proses Sdn Bhd | 30-05-2005 | |
Thaindo Palm Oil Factory Co. Ltd | Engineering, Procurement, Construction and Commissioning of 30-45mt FFB/Hr POM,Thailand , Lumthap, Krabi | Besteel Berhad | 30-04-2005 | |
PT. Mutiara Bunda Jaya | Supply, Delivery And Install Palm Oil Mill Equipment | Besteel Berhad | 28-09-2004 | |
Pitak Palm Oil Co., Ltd. | Engineering, Procurement, Construction and Commissioning of 30 MT/Hr. upgrade to 45 MT/Hr. POM, Thailand | Besteel Berhad | 20-03-2004 | |
PT. Besteel Prima Perkasa | Proposed for 45-60 MT/hr. POM Owner : PT. Sinar Pandawa (Import Portion) | Besteel Berhad | 05-07-2005 | |
PT. Pinago Utama | Proposal for 45 MT/Hr. upgrading to 90 mt/hr. processing POM | Besteel Berhad | 30-03-2005 | |
Sarawak Plantation Agriculture Dev. S/B | Proposal upgrading of threshing station | Besteel Berhad | 30-12-2004 | |
Sinico Sdn. Bhd. | Proposed dumpas POM project in sabah for Regional Harvest Sdn. Bhd. | Regional Harvest S/B | 15-04-2005 | |
Tradewind Plantation Services S/B | Supply, Construct and Compeltion of Contract No.5 Mechanical & Piping Works incluidng Water Treatment Plant for the Proposed Retus POM Pasai Siong, Sibu, Sarawak | Kosultant Proses S/B | 31-05-2005 | |
Sinico Sdn. Bhd. | Kernel Recovery Station and Water Treatment Plant and Monsok POM | Besteel Berhad | 15-02-2005 | |
Monsok P.O.M Sdn. Bhd. | Vacuum Dryer - Installation Oil Drier Fitting and Equipment | Besteel Berhad | 15-11-2004 | |
Dominion Square Sdn. Bhd. | Thresher Roller c/w Shaft 2 nos. Bearing and 2 nos Bearing Cover | LKPP | 30-08-2004 | |
Sarawak Plantation Agriculture Dev. S/B | Two ( 2 ) Hydraulic Winches complete with Ancillary items for Mukah Palm Oil Mill | Besteel Berhad | 27-05-2004 | |
Sarawak Plantation Agriculture Dev. S/B | Sterilizer Automation Control System & compare with Ancillary items for Mukah Palm Oil Mill | Besteel Berhad | 27-05-2004 | |
rawak Plantation Agriculture Dev. S/B | Supply, Delivery, Fabrication, Installation, Testing & Commissioning of One (1) unit Sterilizer & Automation Control System Complete and Two (2) units Hydraulic Winches c/w Ancillary Items for Mukah POM | Besteel Berhad | 19-06-2004 | |
Sarawak Plantation Agriculture Dev. S/B | Supply, Delivery, Fabrication, Modification, Extension, Dismantling, Installation and Replacement of Existing Building Roofing and Cladding for Mukah POM | Besteel Berhad | 01-04-2004 | |
Monsok POM S/B | Proposed 40/80 TPH FFB POM Upgrading Monsok POM from 45ton FFB/Hr to 90ton FFB/Hr | Besteel Berhad | 30-04-2004 | |
Melangking Oil Palm Plantation S/B | The Execution & Completion of Contract No. 4 for all Civil & Structural Works including Raw Water Supply and Mechanical and Piping Works including Water Treatment Plant for Melangking POM at Sukau, Sandakan, Sabah | Kosultant Proses S/B | 05-10-2004 | |
Peladang Urus S/B | Supply, Construction, Completion and Commissioning of Mechanical Plant at Kahang POM, Keluang, Johor. | Boustead Estate Agency S/B | 11-06-2004 | |
Teknoemas S/B | Design, Supply, Manufacture, Fabricate, Deliver, Install, Complete and Commissioning for PT Dutamulti Intipalma Perkasa POM at Desa Bkt Kecamatan Singkut, Kabupaten Sarolangun Jambi | Besteel Design | 30-09-2004 | |
Sarawak Plantation Agriculture Dev. S/B | Extention of Mukah POM based on the Alternative Design | Besteel Berhad | 11-03-2004 | |
Peladang Urus S/B | Supply & Construction of POM & Ancillary Works for PPNJ Kahang POM | Boustead Estate Agency S/B | 31-03-2004 | |
Borneo Samudera S/B | Completion Infrastructure, Building, Mechanical & Electrical Works for Proposed Upgrading of Langkon POM at Kota Marudu Kudat, Sabah | Konsultant Proses Sdn Bhd | 29-03-2004 | |
PT. Pinang Witmas Sejati | Proposed 45/90 tons FFB Per Hr Fabrik Kelapa Sawit PT Pinang Witmas Sejati at Palembang, Indonesia | Agropac Consultants Sdn Bhd | 25-10-2004 | |
PT. Telaga Hikmah | Mechanical works for 60tons FFB/Hr POM at Palembang, Indonesia | Lee Ah Kiaw S/B | 06-02-2004 | |
PT. Pinago Utama | Supply, Deliver, Install and Commissioning One Line of 45tons FFB/Hr Extendable to 90tons POM at Sekayu, Palembang | Besteel Design | 06-01-2004 | |
Tradewinds Plantation Services Sdn. Bhd. | Supply of Proprietary Equipment for the Proposed Retus P.O.M, Sibu Sarawak. | Konsultant Proses Sdn Bhd | 30-11-2003 | |
Tradewinds Plantation Services Sdn. Bhd. | Supply of Proprietary Equipment for the Proposed Retus P.O.M, Sibu Sarawak. | Konsultant Proses Sdn Bhd | 30-11-2003 | |
PT. Perdana Intisawit Perkasa | Mechanical Works for Extension to 90tons FFB/Hr POM for PKS PISP, Riau, Indonesia | Besteel design | 30-09-2003 | |
Rinwood Sago Plantation S/B | Supply, Delivery, Construction, Completion, Testing, Commissioning, Guarantee and Maintenance of Mechanical Works for Rinwood Sago POM at Mukah, Sarawak | Sawit Kejuruteraan Sdn Bhd | 07-08-2003 | |
LKPP Corporate S/B | Supply, Construction, Completion, Commissioning and Guarantee of Civil and Mechanical Works for LKPP POM | Sawit Kejuruteraan Sdn Bhd | 30-07-2003 | |
First Star Engineering Sdn. Bhd. | Proposed For Morisem POM 'B' - IOI Project | Perunding AME | 30-06-2003 | |
Lenga POM/ Kai Peng | 60/120 tons FFB/hr for Lenga POM | Perunding AME | 28-02-2002 | |
PT Perdana Intisawit Perkasa | Construction, Completion and Guarantee of Mechanical and Water Treatment Plant Works for the Proposed PKS PISP, Riau, Indonesia | 30-04-2001 | Mr. Lee Ah Kiaw | |
MHC - Kemayan POM | Extension Works - (Parcel 'A') - Civil and Mechanical Works | Agropac Consultants Sdn Bhd | 30-01-2002 | |
PT Mustika Agro Sari | Supply, Manufacture, Fabricate, Deliver, Install, Complete and Test Mechanical Works and Water Treatment Plant for Fabrik Kelapa Sawit Mustika, Pekanbaru | Agropac Consultants Sdn Bhd | 30-01-2002 | |
Batu Lintang POM/ Kai Peng Cons. S/B | Extension Work at Batu Lintang and Kuala Petang | KL Kepong | 30-03-2001 | |
IOI Corperation Bhd. | Mechanical Works (Extension) for Ladang Sabah POM | Sawit Kejuruteraan Sdn Bhd | 30-05-2001 | |
Pontian Fico Plantation/ Kai Peng Cons. S/B | Turkney Construction of Mechanical and Electrical Works on 45tons extendable to 90 tons FFB/hr POM Lahad Datu, Sabah | Besteel design | 15-03-2001 | |
P.T. Citra Panji | 30/60tons FFB/Hr POM in Pangkalan Bun Central Kalimantan, Indonesia for PT Sabut Mas Abadi POM | Teknoemas S/B | 30-06-2001 | |
Syarikat Trushidup Sdn. Bhd. | Construction, Completion of 1 unit 2000mt Bulk Storage Tank for the Extension of Syarikat Trushidup | Sawit Kejuruteraan Sdn Bhd | 15-07-2000 | |
Teknoemas Sdn. Bhd. | Press Strucuture for ARSO II | Mr. Goh Kok Seng | 31-03-2000 | |
P.T. Ciliandra Perkasa | Supply, Construction, Completion, Commissioning and Guarantee of Civil & Structural Works, Mechanical and Water Treatment Plant for the Proposed 45/90tons FFB/Hr in Indonesia | Mr. Lee Ah Kiew | 31-10-2000 | |
Ever-Yield Sdn. Bhd. | Construction, Fabrication, Installation and Erection of Mechanical Works for Ever-Yield POM, Sandakan, Sabah | Agropac Consultants Sdn Bhd | 30-05-2000 | |
Monsok Palm Oil Mill Sdn. Bhd. | Construction, Completion and Guarantee of Civil & Structural, Ancillary Works, Mechanical Works and Water Treatment Plant for Monsok POM, Labuk, Sandakan, Sabah | Sawit Kejuruteraan Sdn Bhd | 30-07-2000 | |
Pembangunan Ladang Hassan Sdn. Bhd. | Construction, Supply, Fabrication, Erection Installation and Commissioning of 45tons FFB/Hr Palm Oil Mill including all Ancillary Works at Sg. Memanjang, Beluran, Sabah | Konsultant Proses Sdn Bhd | 31-10-2000 | |
Syarikat Trushidup Sdn. Bhd. | Fabricate and Supply one unit Sterilizer and 25 units of 3.5mt Fruit Cages | Konsultant Proses Sdn Bhd | 17-03-1999 | |
Syarikat Trushidup Sdn. Bhd. | Construction, Completion and Guarantee of Mechanical Works for the Extension of Trushidup POM | Konsultant Proses Sdn Bhd | 31-07-1999 | |
Halusah Ladang Sdn. Bhd. | Supply, Fabrication, Deliver, Installation, Testing, Commissioning and Guarantee of Mechanical & Raw Water Treatment Plant for Sakilan POM, Sabah | Konsultant Proses Sdn Bhd | 31-10-1999 | |
Tung Hup Palm Oil Mill Sdn. Bhd. | Execution & Completion and all Mechanical Piping Works including Water Treatment Plant, Sg Lokan, Kinabatangan, Sabah | Konsultant Proses Sdn Bhd | 30-06-1998 | |
Prolific Yield Sdn. Bhd. | Earthwork, Civil & Steel Works, Structural Works, Mechanical & Electrical for Prolific Yield POM | Konsultant Proses Sdn Bhd | 30-06-1998 | |
W.T.K. Oil Mill | Construct, Design, Fabricate, Test and Commissioning Palm Oil Factory (30/60tons FFB/Hr) at Sg Nyalau Estate, Bintulu, S'wak | Agropac Consultants Sdn Bhd | 31-01-1998 | |
Abadi Mewah Sdn. Bhd. | Construction, Completion & Guarantee of Mechanical Works for Abadi Mewah POM,Sandakan, Sabah | Konsultant Proses Sdn. Bhd. | 30-11-1997 | |
Sykt Trushidup Sdn. Bhd. | Construction, Completion & Guarantee of Mechanical Works for Proposed Sukau POM Kinabatangan, Sabah | Sawit Kejuruteraan Sdn Bhd | 31-03-1997 | |
First Star Engineering Sdn. Bhd. | Structural Steel Works for Main Building Workshop and Store, Oil Receiving Shed, including Platform for Sukau POM | Mr. Tan Thean Hock | 30-06-1996 | |
Teknoemas Sdn. Bhd. | Supply Materials, Labour and Tools for Fabrication at Ungkaya POM at Indonesia | Mr. Goh Kok Seng | 31-05-1994 | |
Teknoemas Sdn. Bhd. | Supply C.K.D. Form 30tons FFB POM Machineries for delivery to Indonesia | Mr. Goh Kok Seng | 20-12-1992 | |
Salcon Engineering Sdn. Bhd. | Supply Materials, Labour, Consumable, Tools and Equipment to Fabricate Bulk Storage Tank, Cages, Transfer Carriage System, Thresher, Press Structure and Depericarper | Mr. Liew Poi Fatt | 15-06-1991 | |
Tee Teh Sdn. Bhd. | Supply, Deliver, Install and Hydrostatic Testing 2 nos. 9 x 2.5 tons FFB/Hr Sterilizer c/w Hinge Rail Pieces | 20-12-1987 | ||
Tee Teh Sdn. Bhd. | Design, Fabrication, Erection, Testing and Commissioning of Palm Oil Fruitlet Recovery Plant (FFB) | Mr. Choy Lin Ngan | 19-12-1985 | |
Tee Teh Palm Oil Mill | Extension of 20 Tons FFB for POM at Karatong c/w all civil & related works | Mr. Choy Lin Ngan | 30-09-1984 |
Palm Oil Milladmin2018-03-28T09:05:43+00:00