ESPEK SDN.BHD 4 Units of Tilting Sterilizer,Conveyor,Electrical works,Civil and Structural works at Kilang Sawit RISDA Ulu Keratong,Muadzam Shah,Pahang Malaysia. 15-09-2017
TRONG PALM OIL MILL TILTING STERILIZER
GAP OIL MILL TILTING STERILIZER 01-02-2018
PT LIFERE AGRO KAPUAS TILTING STERILIZER 01-12-2017
Feronica-Plantations ET Huileries Du Congo To supply S.S304 type Tilting Sterilizer System c/w Sterilizer Hydraulic Cylinder,Hydraulic Tubing,Power Pack,Frontal Piping,Insulation and Hydraulic & Steam Automation Control System for Lokumete POM. 07-04-2018
PT Buana Sriwijaya Sejahtera Mechanical works of palm Oil mill 80mt Ext 160mt FFB per hour processing at Sumatera. 27-03-2019
WTK Oil Mill Sdn.Bhd. (Sinar Firus Sdn.Bhd.) Design,supply,delivery to site,unloading,installation, complete,test and commision, maintain & performance guarantee for Four (4) units of Tilting Sterilizer(3200mm Dia x 7200mm x 12mm Thick S/S 304S c/w Ancillary equipment a 02-07-2018
Sawit Kinabalu Construction of Civil,Building,Electrical and Mechanical works for Apas Balung POM,Tawau. 30-08-2019
Okomu Oil Palm Co.PLC Conventional type Sterilizer Palm Oil Mill capacity 30mt ext 60mt FFB per hour POM Processing consist of Two(2) 30mt/hr Lines for Okomu Two at Nigeria. 28-08-2019
Ecotaua Particapates S/A 2 units of Tilting Sterilizers 1/7/2018
Mejer Agroflorestal Turnkey Project for 2 units of Tilting Sterilizer at Belem,Brazil. 9/9/2018
Kahang Palm Oil Mill 1 unit of Tilting Sterilizer 22/7/2018
Palmgroup Palm Oil Mill The Design,Supply,Delivery to site,Unloading,Installation, Complete, Test and Commission,Maintain & Performance Guarantee for Four (4) Units of Tilting Sterilizers C/W Ancillary equipment as specified. 24/3/2019
Thongmongkol Palm Supply 1 unit S.S 304 type of Tilting Sterilizer System c/w Sch40 Frontal Piping 3,200mm x 7200mm (L) x 12mmt W/O Liner. 22/6/2018
Feronica-Plantation ET Huileries Du Congo Refurbishment Mechanical & Electrical works for Feronica PHC Boteka POM at Congo. 21/1/2019
Agropalma Turnkey project for 2 units of Stainless Steel 304Tilting Sterilizer c/w PLC Control & Hydraulic System at Thailandia,Brazil. 9/12/2018
Sawit Kinabalu Design,Supply,Deliver,Construct,Complete,Testing,Commissioning and Guarantee of Biogas and Power Generating Plant at Sebrang POM. 24/12/2019
Sodimex S.A Installation,erection works of 10mt FFB per hour Palm Oil Mill Processing at Sao Tome. 28/3/2019
BOUSTEAD Estates Agency Sdn.Bhd. Supply,Delivery,Installation & Commissioning of Replacement of Wet Shell Cyclone c/w Trunking,New Sludge Boiling Tank and New CPO Storage Tank Recycling System for Rimba Nilai Palm Oil Mill,Sugut,Sabah. 24/2/2019
Palmas Catatumbo S.A Design,Fabrication,supply,delivery,supervision,testing and commisioning and guarantee in drawing accordance with drawing and specification three units of Tilting Sterilizer c/w Steam Control System and Piping works at Colombia. As per Contract
The Okomu Oil Palm Company PLC Additional works for New Line of Mechanical & Electrical works for Okomu Oil Mill,Nigeria. 9/8/2019
Ecotaua Particapates S.A Additional-Supply two (2) units of Tilting Sterilizer C/W Steam System,Piping works and Electrical works in Belem,Brazil. 12/3/2019
PH Palm Express Sdn.Bhd. 3 units of Tilting Sterilizers As per contract
Sodimex S.A Conventional type Sterilizer Palm Oil Mill extension to 60mt FFB per hour POM Processing at Sierra Leone. 29/9/2020