Client | Scope Of Work | Consultant Engineer In Charge | Date Of Completion | Contract Value ( RM ) |
---|---|---|---|---|
Sodimex S.A | Supply,Fabricate and Delivery 4 units of Nut Polishing Drum Include Drive. | Besteel Berhad | 18-07-2010 | |
Flareon S/B | Supply and Fabricate 1 Unit Retractable Davit c/w Boom and Collar. | Flareon S/B | 26-05-2010 | |
Polysius Engineering (M) S/B | Amerafa Project Supply and Fabrication of Platework | Polysius Engineering (M) S/B | 31-07-2007 | |
Linnhoff Technologies Pte Ltd | 2 units of Drum Unit complete with Hot Bin for MSD-2500 Dia 2400 x 8300 Drum Unit complete with Hot Mineral Bin | Linnhoff | 18-08-2007 | |
Polysius Engineering (M) S/B | Rockver Project Supply and Fabrication of Platework | Polysius Engineering | 30-06-2007 | |
Polysius Engineering (M) S/B | Keycem Project Supply and Fabrication of Platework | Polysius Engineering (M) S/B | 28-02-2007 | |
Linnhoff Technologies Pte Ltd | 4 units of Drum Unit complete with Hot Bin for MSD-2500 Dia 2400 x 8300 Drum Unit complete with Hot Mineral Bin | Linnhoff | 31-03-2007 | |
Hexagon Tower Sdn. Bhd. | Fabrication and Erection of Steel Storage Tanks, Mission Biodiesel Plant Project, Kuantan | Konsultant Proses Sdn. Bhd. | 09-01-2007 | |
Alstom Power Asia Pacific S/B | Jimah Coal Fired Power Plant,Malaysia (2x 700MW) Fabrication Work for FGD & ESP | Ishi Power Sdn. Bhd. | 07-10-2008 | |
Linnhoff Technologies Pte Ltd | 2 units of Drum Unit complete with Hot Bin for MSD-2500 Dia 2400 x 8300 Drum Unit complete with Hot Mineral Bin | Linnhoff | 23-12-2006 | |
Dalex Engineering Sdn. Bhd. | Supply & Install of Steam Piping for Project at Kunak Sabah | 30-11-2006 | ||
Inno-Vision Engineering Sdn. Bhd. | Design, Supply, Fabricate, Testing, Dosh Approval and 3rd Party Inspection, Packing and Marking of Mixing Tank and Recovery Tank | Besteel Berhad | 31-10-2006 | |
Inno-Vision Engineering Sdn. Bhd. | Supply, Fabricate, Construction Equipment, Trial Assembly, Painting, Packing and Marking for Duct Collector | Besteel Berhad | 31-10-2006 | |
S & V Teknik Sdn Bhd | Supply and Install Steel Fabrication Work of Wind Tunnel for UIA (Variation Order No 1) | Besteel Berhad | 23-10-2006 | |
Alstom Power Asia Pacific S/B | Supply and Fabrication of Ancor Frames And Foundation Boilts for FGD & ESP Jimah Coal Fired Power Plant, Malaysia (2 x 700 MW) | Besteel Berhad | 09-05-2006 | |
Linnhoff Technologies Pte Ltd | 2 unit of Drum unit complete with hot bin for MSD-2500 Dia 2400 x 8300 Drum Unit complete with hot mineral bin | Linnhoff | 09-08-2006 | |
Kvaerner Pulping AB | Supply, fabricate and delivery structural for Project Julp, PM8, PM9 Fiberline modification | Kvaerner Pulping AB | 15-09-2006 | |
Kvaerner Pulping AB | Supply, fabricate and delivery structural and miscellaneous steel for project Jiang Lin 4000 | Kvaerner Pulping AB | 25-10-2006 | |
Gas Advisors Australia Pte Ltd | Design & Build Stainless Steel 316 Pressure Vessel | 06-02-2006 | ||
Wealth View Industries Sdn Bhd | Supply, Fabricate & Erection of MS Chimney Delivery to Site (Nilai) | 31-05-2006 | ||
Linnhoff Technologies Pte Ltd | Supply, Fabricate, Paint as per Installation Drum Unit With Base Frame C/W Support For LH4000 (SC-050.000.03) | Linnhoff | 06-02-2006 | |
S & V Teknik S/B | Supply & Install Steel Fabricatio Works Of Wind Tunnel for ULA | Besteel Berhad | 23-10-2006 | |
Linnhoff Technologies Pte Ltd | Drum Unit Complete with Hot Bin for MSD - 2500 (SC-05000002) Dia 2400 x 8300 Drum Unit Complete with Hot Mineral Bin | Linnhoff | 10/10/2006 | |
Polysius Engineering (M) S/B | Orofa Project Supply and Fabrication of Platework | Polysius Engineering (M) S/B | 30-06-2006 | |
Kvaerner Pulping AB | Supply, Fabrication of Steel Structural And Miscellanous Steel Painting, Marking, Quality Control,Packing and Delivery FOB Port Klang J pulp and PM9 - Structural & Miscellanous Works J pulp and PM9 - Pipe Support Material PM | Kvaerner Pulping AB | 14-08-2006 | |
Alstom Power Asia Pacific S/B | Bakun Hydro Electric Project Turbine 4 Units - (PA 13) Pit Lines 4 units - (PA 52) Draft Tube Cones 4 units - (PA 40) Bearing Housing 1 Lot - Tools | Alstom Power Asia Pacific S/B | 15-09-2006 | |
Linnhoff Technologies Pte Ltd | 2 units of 2.4m & 2.6m Drum with Bin Structural | Linnhoff | 30-01-2006 | |
Recycle Energy Sdn Bhd | Contract for Design, Manufacture, Delivery Installation & Waste to Energy Project & Commissioning of Pre/Final Dryers for Resource Recovery Centre & waste to Energy Project | Besteel Berhad | 21-08-2005 | |
Recycle Energy Sdn Bhd | Contract for Design, Manufacture, Delivery, Installation & Commissioning of Rotary Screen for Resource Recovery Centre & Waste to Energy Project | Besteel Berhad | 30-07-2005 | |
Polysius Engineering (M) S/B | Yamaver Project Supply and Fabrication of Platework | Polysius Engineering (M) S/B | 06-10-2005 | |
Vyncke Energietechniek N.V | Supply, Fabricate, Delivery Schedule for Condensate Vesel, Deaerator Vessel and 2 units Heat Exchange | Vyncke Energietechniek N.V | 15-08-2004 | |
Polysius Engineering (M) S/B | Codeword: Eastver Project Supply and Fabrication at Platework | Polysius Engineering (M) S/B | 30-09-2004 | |
Vyncke Energietechniek N.V | Economiser (Fluegas - Steam Certified) and Superheater | Vyncke Energietechniek N.V | 15-05-2004 | |
Polysius Engineering (M) S/B | Codeword : GIFA - Chutes & Ducts Supply and Fabrication of Platework | Polysius Engineering (M) S/B | 25-09-2003 | |
Polysius Engineering (M) S/B | Supply and Fabrication of Platework/Cement Plant Equipment for SOLICOOL Project | Polysius Engineering (M) S/B | 15-08-2003 | |
Shapadu Energy S/B | Bekok Gas Deboittlenecking Project Supply of Exhaust Stack and Stanter Gas Scrubber | Shapadu Energy S/B | 22-02-2003 | |
Alstom Power Asia Pacific S/B | Secondary Structural Steel Works Supply, Fabrication and Deliver to CUF site, Kerteh | Alstom Power Asia Pacific S/B | 27-08-2002 | |
Petronas Gas Berhad | Design Connection Detail, Supply, Fabrication and Delivery of the STG Structure Steel Works to the Cogen Shelter Extension | Foster Wheeler (M) Sdn Bhd | 27-08-2002 | |
Aquakimia S/B | Design, Supply, Fabricate, Test and Deliver of Vacuum Container, Thermal Deaerator, Water Softener and Sand Filter | Besteel Berhad | 30-06-2002 | |
De Smet (M) S/B | Supply, Fabricate and Test for 5 units of Stainless Steel Vessel for Oil Refinery Project at Singapore. | De Smet (M) S/B | 30-05-2002 | |
Merbok MDF S/B | Supply and Fabricate of Heat Exchangers an Pressure Vessels, total 6 nos | Merbok MDF S/B | 30-08-2001 | |
Petronas Carigali S/B | ANSI-ACPP Crude Custody Metering Skid System Blasting and Painting | Mecomc/HL Engineering | 15-08-2000 | |
Esso Production Malaysia Inc | Larut-ACPP Crude Custody Metering Skid System Blasting and Painting | Mecomc/HL Engineering | 15-10-2000 | |
BASF Petronas Chemical | MBOX Painting and Site Erection of 200t Steel Structure | Toyo/Equator | 20-12-2000 | |
BASF Petronas Chemicals | Design, Fabricate and Delivery 2 units of Air Receiver and Supply 3 units of Air Filter | Besteel Berhad | 15-10-2000 | |
Petronas Gas Bhd | Procurement, Construction and Commissioning of Ethane, Propane and Sales Gas Station. | OGP Technical Service Sdn Bhd. Peremba Sdn Bhd. | 15-12-2000 | |
Petronas Gas Bhd | Detail, Design, Supply, Fabrication, Delivery and Erection of Kertih | Foster Wheeler (M) Sdn Bhd. | 30-09-2000 | |
BASF Petronas Chemicals | Design, Fabricate and Delivery 1 unit of Air Receiver | Besteel Berhad | 15-08-2000 | |
MTBE | Propane Dehydrogenation Gebeng III, Kuantan Underground Piping | Ho Hup Construction HL Engineering | 31-07-1999 | |
MTBE | MTBE 150M Guy Support Flare Stack (Kaldair Ltd) | Kaldair Ltd England | 30-08-1999 | |
MTBE | Fabrication Works for Bechtel Flare Stack Polythylene Plant P-1633 | Kaldair Ltd USA | 15-07-1999 | |
Shin Eversendai Engineering (M) S/B | Maintenance Access for Air Blaser in Slot Maintenance Access for Air Blaser in Slot Bunker at SSAA Power Station, Kapar | IHI Engineering | 05-08-1999 | |
Petronas Gas Bhd | Centralised Utility Facilities Project: Supply, Fabrication and Delivery of Structural Steel Works Package 2 for Kerteh and Gebeng | Foster Wheeler (M) Sdn Bhd | 08-03-1999 | |
MTBE | Supply, Fabricate, Deliver and Install 1 unit of Flare Stack, Dialogue, Kuantan | Kaldair Ltd U.S.A. | 22-06-1999 | |
Petronas Gas Bhd | Centralised Utility Facilities Project - Structural Steel Works: Supply, Fabricate and Erection of Co-gen Shelters At Kerteh and Gebeng | Foster Wheeler (M) Sdn Bhd | 08-03-1999 | |
Sunds Defibrator Woodhandling OY | Supply and Fabricate Steel Works for Woodhandling Projects in Musi Pulp Indonesia and Golden Hope Fibreboard S/B | Pittsoon Sdn Bhd | 13-05-1998 | |
Tenaga Tiub Sdn Bhd | Supply, Fabricate and Test 2 units of Super Heater and 1 unit of Economiser | 20-04-1996 | ||
Vietnam Cement Plant | Supply & Fabricate Grinding Mill Equipments | Krupp Polysius | 15-10-1996 | |
Fong Dat Construction Sdn Bhd | Supply Material, Labour and Consumable to Fabricate and Erect Bulk Cement Depot at AMPC, Rawang | Setia Sepakat Perunding | 31-01-1993 | |
Fong Dat Construction Sdn Bhd | Supply Materials, Labour and Consumable to Fabricate & Erect Bulk Cement Depot at Wisma APMC, No. 2, Jalan Kilang, Petaling Jaya | Minconsult Sdn Bhd | 30-09-1991 | |
Kien Tat ( Construction ) Sdn Bhd | Supply Material, Tools & Labour for the Installation, Erection and Commissioning of a 2 x 300 MW Turbo Alternator with Ancillary Plant at LLN Port Klang Thermal Power Station, Kapar, Klang for Mitsubishi Heavy Industries Ltd | Kien Tat & Eng. & Supervising Teams From Port Klang Power Station | 13-04-1998 | |
Kien Tat (Construction) Sdn Bhd | Supply Material, Tools & Labour for the Installation, Erection and Commissioning of a 2 x 300 MW Turbo Alternator with Ancillary Plant at LLN Port Klang Thermal Power Station, Kapar, Klang for Mitsubishi Heavy Industries Ltd | Kien Tat & Eng. & Supervising Teams From Port Klang Power Station | 30-01-1996 | |
N.P.C. Engineering Corporation | Fabricate, Deliver and Install Screen Cages for ini Hydro Power Station at Raub, Pahang | Mr. Y. Inabi | 14-05-1985 | |
Bukit Jalil Palm Oil Station | Supply and Construct Administration Office and Workers\' Quarter | 19-01-1988 | ||
Taman Jelebu | Supply and Construct 18 units Shop Houses, 30 units Medium Cost and 65 units Low Cost Terrace Houses at Taman Jelebu, Seremban | Mr. Liew Chee Lin | 21-07-1986 | |
Tee Teh Sdn Bhd | Construct 30 Units of Semi-Detached Workers Quarter | Mr. Tan Kuen Fah | 26-06-1983 |
Cement Industry,Power Plant, Oil & Gasadmin2018-03-27T03:25:59+00:00